The Daily Record on MSN5d
Design plans: Building would house Holmes County Engineer's Office, equipmentHolmes County commissioners contracted with Tekton Engineering to design plans to redevelop the county garage site.
Modular offices are prefabricated structures built off-site in sections, then assembled at the desired location. This method speeds up construction, reduces costs, and minimises disruptions.
Opus Group’s new 112,000-square-foot office building in Edina gets approval from the Planning Commission, set to serve as ...
Terra Investments and SRM Associates want to replace a three-story office building with an apartment building near UC ...
As the designs were being discussed at the city building, the Washington County commissioners were meeting at the Crossroads ...
A limited liability company led by Lori Junkins wants to raze an office building in Newport Beach for a 76-unit apartment ...
ARCO Design/Build, a leading national design-build firm, today announced the expansion of its Charleston operations with the ...
Council approved two sets of companion ordinances to redevelop the 16.42-acre site in the 7800 and 7900 blocks of the ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results